Chino and Ontario, CO
Contract Value: $1,100,000
General Contractor: E Light Wind and Solar
Duration: 3 months
|
This project included the installation and wiring of over 7,106 photovoltaic panels with the capacity to produce 1.6 megawatts. All three sites are tied to the utility grid power via 13.8 kilovolts. These systems will help offset a small portion of Ontario, California's Waste Water Treatment Plant power consumption. 3,718 ground mounted panels and 3,388 tracker panels.
|